Dixon Transport Phase 2

Project:

Keelings Food Central, St Margarets, Co Dublin

Client:

Dixon Transport

Architects:

Keith Ludlow Associates

Value:

€1.5 million

Dixon Transport Phase 2

New temperature controlled warehouse extension consisting of 23,200 sq ft ground floor with 14m high pallet racking system with 3,800sq ft first floor mezzanine storage. 2 new Hormann Dock Levellers. FM2 grade concrete floor slab specially designed for the automated pallet racking forklift system with full completion in 4 months